Showing posts with label Tree Spires. Show all posts
Showing posts with label Tree Spires. Show all posts

September 26, 2008

Reno ManGrove Flyer

If you're heading to Reno before mid-December be sure to visit our Tree.

September 23, 2008

A Tree Grows in Reno

As Burning Man 2008 ended, most of the Iron Monkeys headed north, returning to life here in "reality camp." While we were buying vinegar in bulk and reminding ourselves to wear clothes and not drink before noon, an elite team of Monkeys was dispatched to Reno where they lounged by the pool, stormed the casino at the Peppermill, AND installed one of our trees in a temporary sculpture park located in downtown Reno. The Mangrove - Reno, a nod to the collection of recycled material trees from Burning Man 2007 of the same name, sits on the bank of the Truckee River. Tony, Jannette, Tabasco and Kay - I think I speak for all the Monkeys when I say "hey, thanks for going to Reno." We raise our BRetford-crafted beers to you.

Other press about the Reno Mangrove:
The Mangrove Reno Art Installation Downtown Reno

August 9, 2008

Tree Spires: A Retrospective


For Burning Man 2007 we received an art grant for our project, Tree Spires, four 15' tall steel trees the trunks of which are encircled by octagonal wood and steel benches.
Installed in the Mangrove, the Tree Spires were located at the cardinal points and provided passersby a place to sit, rest and reflect.









The "bark" of the trees is made up of 4' long strips of 2 and 4-inch wide mild steel. Tabasco created a bark texture template that, when used with a really big power hammer on hot steel looks, well, very much like bark. But better. 'Cause, you know, it's steel. Okay, real bark is pretty cool, too.



















On the playa, we encouraged visitors to leave evidence of their time at the trees. We busted out our Sharpies™ and left some starter graffiti; the resulting "vandalism" ranged from touching to funny.


July 7, 2008

The troops go on and on

So besides working on the base these girls are also working on the grating which will be inside the cauldron.




Now that most of the base is finished it time to start working on the top. This is just the frame we are working on.




Oh and don't forget we have to still work on the Tree Spire for the temp install in Reno Sept 4th install.